Freeway Guardrail Expressway Fence Safety Panel Chilly Roll Forming Device Guard Rail Production Line
CZPT Technical specs
1. Decoiler
With two tapered electric bulgy clamps, and its carrying capability is eight tons. The internal diameter of the roll substance is about 500 to 600mm, the greatest diameter of metal coil is 1800mm. Clamp motor electricity is two.2kw with 4-pole standard motor. Undertake ZQ250 pace reducer, its pace ratio is 31:five.
2.Leveling Machine
Wallboard 7-roller leveler with two-roll pinch and five-roll leveling. Leveling roller diameter is 110mm. The leveling device just before and right after has vertical guidebook roll. Feed inlet port outfitted with nip rolls.
content: 40Cr, quenched hardness: HRC48°~52°, motor power:7.5kw, 6-pole standard motor, ZQ350speed reducer, pace ratio: 20:forty nine, φ200 arrester brake.
3.Punching Equipment
Undertake YL32-315 four-column hydraulic punching device, and hydraulic station motor electricity is 22kw. A single established of two waves guardrail plates punching slicing die, design and style and method mostly according to users’ style drawings. The content of mould inserts and plunger chip is Cr12MoV alloy steel. The punching equipment before and right after outfitted with adjustable guide roll. (manual roll substance: Cr12MoV, hardness: HRC58º~60º) Aside from, it also outfitted with a established of spare blade and plunger chip.
four.speedy feeding materials mechanism
It has two pairs of feeders and requires two gets to be a single.
pinch instantly, motor power:2.two kw, ZQ250 speed reducer, hand-change compressing
5.Photoelectric Length-measuring System
number: two pairs, lower size: 4320mm, size precision < ±3.0mm
6. Primary Forming Motor
This unit includes eleven molding processes with independent open up arch framework.
The mechanical spreading width : 550mm.
Arch substance : HT200 , tempered.
The column cross-section measurement: eighty x 70, with enough energy and reputable top quality assurance. Vertical guiding roller quantities: 3
Roller diameter of vertical guiding roller: 80
Materials: 40Cr steel, quenched and tempered.
CZPT kind: Fixed floor 7216, regulation 32216, every has four.
Quantities of dual-axis gear box: one
Quantities of solitary-shaft transmission equipment box: 9
Bevel modulus: M=9
Gear box materials: HT200.
Host power: 45KW r, electromagnetic velocity regulating,
Pace reducer: ZQ650
Velocity ratio: 48.57
Use one inch double chain generate among the transmission equipment box universal transmission shaft between the roller shafts, and the universal transmission shaft type is140-275. Use one.five inch dual chain generate between the speed reducer.
7.Forming Mold
A established of two wave guardrail plate roll forming die, developed and processed in accordance to the national normal. The material is GCr15, and the total quenching hardness is HRC58°~ 62°.
8.substance Obtaining Platform
Roller kind content obtaining station, 5m length, 6# metal welded.
9.Control Technique
Widespread handle technique. Can manually and instantly control the harmony of numerous areas of of the complete generation line.
ten.Others
The equipment whole energy is 78.9Kw, with 30000mm * 4000mm length * width. The greatest rolling top is 85mm, the maximum rolling thickness is 4.0mm, and the optimum rolling pace is three ~ 12m/min. Structural supplies of welding equipment seat must satisfy the specifications, welding have to be up to the nationwide common . Gear following rust cleansing must be first of all coated with steel particular anti-rust paint comprehensively masking, and then coated with large quality topcoat. The rotating component must be divided by warning shade.
FAQ
1.Q: Are you company or trading organization?
A: We are manufacture and trading company.
2.Q:What data you require ahead of you make the proposal?
A:The pipe diameter and thickness variety which you need to have or the profile drawings, content details, your particular specifications.
three.Q: what is the MOQ?
A: A single set
4.Q: Do you give installing and debugging overseas?
A: Overseas equipment set up and worker training solutions are optional.
five.Q: Can you make the machine in accordance to my layout or prototype?
A: Yes, we have an skilled group for operating out the most appropriate design and manufacturing strategy for the device that you are going to e-book with us.
six.Q: How does your manufacturing unit do regarding high quality management?
A :There is no tolerance regarding good quality manage. High quality handle complies with ISO 9001.every machine has to past screening working ahead of it’s packed for shipment.
seven.Q: How can I have faith in you that devices pasted screening working before delivery?
A: one) We record the screening video clip for your reference
two) We welcome you visit us and take a look at machine by oneself in our factory.
8.Q: What about our following-sale service?
A: we supply technical support on line as properly as abroad services by skillful experts.
nine.Q: What must I do if I just begin a new company?
A:Contact us instantly ,we give cost-free specialist pre-sales provider.Also we can aid you to fix the substance(metal coil)buy,worker teach,global marketplace value.
10. Q:Can I pay a visit to you manufacturing facility to check out devices on-site ? What Should I bring when I check out your manufacturing facility?
A: We are manufacturer, and we welcome buyers to pay a visit to our manufacturing facility. For special merchandise layout and produce, we ask for you bring a piece of screening substance, you can examination on our devices on-site.